For Architects • For Building Owners & Developers

Pre-Design Checklist for Working With a Structural Engineer

The foundation for a smooth project is laid before design begins. In fact, information that arrives late or expectations that aren’t fully communicated at this stage lead to most disruptive structural revisions later in the process. This is your chance to head off future issues.

Use this checklist before design work starts in earnest to ensure that you’ve avoided common pitfalls. Not every item needs a final answer on day one, but every item should have a someone responsible for it and a due date.


Define the Project

☐        The building's intended use and occupancy are documented, including spaces with unusual structural demands (e.g., heavy equipment, storage, assembly areas, fitness rooms).

☐        Known future plans are written down (e.g., possible expansion, added floors, rooftop equipment, tenant changes).

☐        Performance priorities beyond code are stated explicitly (e.g., floor feel, quietness, durability, adaptability, resilience goals).

☐        Must-keep design features are identified (e.g., open spans, ceiling heights, façade elements, column-free areas)

Understand the Site

☐        A current site survey is in hand or commissioned.

☐        The geotechnical (soil) investigation is scheduled. This should happen early enough to inform foundation design, not confirm it after the fact.

☐        For renovations and additions: existing drawings have been gathered, and the condition of the existing structure has been assessed or an assessment is planned.

☐        Known site constraints are documented (e.g., flood zones, slopes, adjacent buildings, access limits, local hazards such as high wind or seismic activity).

Assemble the Team

☐        The structural engineer is selected and engaged for concept design instead of bringing them a developed design to react to.

☐        The engineer's scope of services is agreed in writing: what's included, what's an additional service, and which items others will handle.

☐        Construction-phase services (e.g., shop drawing review, contractor questions, site visits) are in the scope, not cut to make the fee look more attractive.

☐        Every needed service on the project has a named provider — nothing is assumed to be “someone else's job.”

☐        The contract documents reference the recognized standard of practice for the project's primary structural material, so responsibilities for design, detailing, fabrication, and erection are defined the same way by everyone on the team.

Set the Ground Rules

☐        A single point of contact is named for decisions, and the team knows who can approve changes.

☐        The team has agreed how design changes will be communicated — and that the structural engineer hears about them when they happen, not at the next milestone.

☐        A regular coordination rhythm is set between the architect, the structural engineer, and other consultants.

☐        Decision deadlines are mapped: the team knows which choices (e.g., structural system, grid, materials) must be locked in and when.

Align on Budget and Schedule

☐        Budget expectations have been shared with the design team, including the structural engineer.

☐        The structural system will be reviewed against cost early, before pricing feedback can force a redesign.

☐        The delivery method and schedule are communicated, including any fast-track or early-package plans that may affect structural sequencing.

☐        Fee comparisons for consultants are being made on matching scope, not on the bottom-line number alone.

Before you move forward

If every box above is checked, or has a named responsible party and a due date, the project is set up as a well-run project. Decisions are informed before they're locked in, expectations are stated before they're tested, and the structural engineer is well-positioned to contribute from the first sketch. And you’re well on your way to a successful, collaborative project!